Design – Build DV-3 Border Fence Project
New Construction – Completed January 2009
Contract Value: $23.7 million
Performance Safety provided project safety personnel with (1) SSHO and (1) alternate for this fast track project for the U.S. Border Patrol for 100 days. DV-3 is located within the Border Patrol’s Tucson Sector, Ajo and Casa Grande Stations and traverses 10.83 miles along the International Boundary between the United States and Mexico.
Due to the location and the 7 days a week and 12 hour days work schedule most contractors staged personnel at base camp with housing, showers and a camp cafeteria.
Recognition
Client Testimonial
The DV-3 project was a fast track project, which made Performance Safety’s responsibility of keeping everyone informed of being aware of their personal safety responsibility’s a challenging one, but with a zero recordable accident record, Performance Safety showed they were up to the challenge.
– Ivan M. Caceres – Quality Assurance (Army COE)